Announcement of the tender for the renovation of King 18 conversion project at the No. 1 Oil Production Plant of PetroChina Changqing Oilfield Company

Name of Project: Wang Shizhuo, No. 1 Oil Production Plant, Changqing Oilfield Company, PetroChina
Item Number-DBLH-0001213
I. Tender conditions
The construction project of this project has fulfilled relevant approval and filing procedures as required. The funds have been implemented and the conditions for tendering have been met.
II. Overview and scope of tender
1. Bidding project name: The first oil refinery No. 18 of Changqing Oilfield Company, PetroChina, is undergoing the reconstruction project of Wang Shijiao. 2. The scope of the tender: 1 5000m3 sedimentation tank will be transformed into a settlement degreasing tank, and the new D20-20*3 production water will be built. Two sets of pumps, one new 2200*1800*2000mm slop tank, two new 1200m3/d three-phase separators, and an in-station network. Construction Drawing Design "Water-12224 / Total Subhead" Except NDT. 3. Implementation location: Zhidan County, Shaanxi Province; 4. Construction period: From the date of signing the contract to February 17, 2017; 5. Technical requirements: Quality acceptance standards within the current construction scope (see the construction drawings for specific standards); 6 , Others: 1) The project needs to be funded by the successful bidder. If we do not receive payment from the owner, we will not pay any funds.
One 5000m3 settling tank was converted to a settlement degreasing tank, two new D20-20*3 produced water outflow pumps were built, a new 2200*1800*2000mm waste oil tank was built, and a new 1200m3/d three-phase separator was built. Network matching and so on. Construction Drawing Design "Water-12224 / Total Subhead" Except NDT.
III. Bidder qualification requirements
1. Qualification requirements: Grade 2 or above of general contracting of petrochemical engineering construction, at the same time, possesses GC1 grade or above for special equipment installation, renovation and maintenance license; holds valid safety production license, and passes quality, environmental protection, occupational safety and health system certification. There is an access permit for the construction contractor of China National Petroleum Corporation. 2.Personnel requirements: The proposed main management personnel and key position staff must be self-employed for the company; and have the corresponding job certificate. The project manager qualifications should have qualifications for registered construction engineers who are majoring in petrochemical engineering or mechanical and electrical engineering. And similar project construction performance, project managers should also have security B card. 3 Financial requirements: The financial situation in the past three years is good, and it has the ability to effectively fulfill the contract assets. 4 Performance requirements: Construction performance of Changqing Oilfield in the past three years (To be able to independently handle issues related to the local people's external relations, all external coordination tasks related to the contracted project during the construction process need to be undertaken independently by the winning bidder, including the then government, residents, and young crops. Compensation and everything else). 5 Credit requirements: In the past three years, the company has a good social reputation and provides proof of no bribery; 6 Others: The Commonwealth does not accept bids from the Consortium. The bid is subject to qualification after the trial. If it fails to pass the qualification examination, it shall not be recommended as the successful candidate.
IV. Acquisition of tender documents
The tender document is to be released on November 08, 2008 at 08:00:00

Wireless Dog Fence

Wireless Fence,Wireless Dog Collar,Wireless Dog Fence,Wireless Electric Dog Fence

Elite-tek Electronics Ltd , https://www.aetertek.ca

Posted on